Energy Generation & Storage

Connection dates do not move. Neither should your transformer lead time.

New Zealand and the Pacific

Manufacturing Power Solutions for Australia, New Zealand and the Pacific

Industry and Communities ‍

across Australia,

Powering‍ ‍

Overview

Solar, wind and battery projects live or die on the connection program. A step-up transformer ordered offshore sits in a queue you do not control, and every week of slip is a week of revenue lost. Tyree engineers and builds here, to your connection specification.

READ recent CASE STUDY

What generation and storage projects need from their supply

Grid connection sets the specification. Step-up and collector transformers have to satisfy the network service provider on impedance, tapping range, vector group and protection before anything is ordered, and those requirements are rarely identical between projects.

Inverter-driven plant is electrically noisy. Harmonic content from inverters and rectifier loads shortens the life of equipment specified against a clean sinusoidal assumption, so the design has to account for the duty the unit will actually see.

Then there is the program. Financial close, construction and energisation dates are contracted and penalised, and a transformer on a ship is a risk you cannot expedite. Manufacturing in Australia and New Zealand puts the schedule inside a conversation rather than a shipping manifest.

RELATED CASE STUDY | ORANA BESS

Powering One of Australia's Largest Battery Energy Storage Projects

Tyree supplied 116 Australian-designed inverter transformers to the Orana Battery Energy Storage System, one of the country's largest grid-scale battery projects, now in full commercial operation on the NSW network.

READ CASE STUDY

What we supply to energy generation and storage

Solar DC and LV Cable

Rated for the environment

DC cable rated for UV exposure and elevated temperature, plus LV distribution cable and switchboards from the same supplier.

Standard
AS/NZS 5033

Cable Range
2,000+ products

Connection Substations

Engineered to the connection spec

Packaged substations with options for SCADA and ADMS integration using preferred and leading components, applying local know how to make it work.

RATINGs
50kVA – 20 MVA

INTEGRATION
SCADA / ADMS

Power Transformers

Step-up and collector duty

Round-coil, core-type design engineered to the network service provider’s connection specification for your project.

RATING
Up to 35 MVA

Voltage
Up to 132 kV

Why developers and EPCs choose Tyree

BUILT TO PROGRAM

A lead time we can commit to

Manufactured in Australia and New Zealand, so delivery is something we can discuss and hold to rather than track across an ocean.

TESTED IN HOUSE

Our own testing laboratories

Routine, special and type testing in our own labs, ISO 9001, 14001 and 45001 certified, with full material and process traceability on every product.

ENGINEERED TO SPEC

Designed to the connection requirement

Impedance, tapping range, vector group and protection engineered to the network service provider’s specification for your project, not adapted from a standard unit.

AFTER DELIVERY

Field service, not just supply

On-site installation support, commissioning, training and in-field testing, then ongoing service, maintenance and technical support.