Infrastructure & Transport

Delivered to program, tested and ready to energise.

Industry and Communities ‍

across Australia,

Powering‍ ‍

Manufacturing Power Solutions for Australia, New Zealand and the Pacific

New Zealand and the Pacific

Overview

Rail, road, port and water projects run to contracted dates with penalties attached. The electrical package is rarely on the critical path until it is. Tyree delivers packaged substations tested and ready to connect, on the date the program needs them.

What infrastructure projects need from their supply

The program is the specification. Staged energisation, possession windows and commissioning dates are contracted, and a supplier who misses one costs the principal contractor more than the equipment is worth. Delivery certainty outranks almost everything else.

Installation conditions are constrained. Tunnels, rail corridors, port aprons and pump stations rarely offer the space or the access a switchroom does, so equipment has to arrive as a single lift, pre-tested, with the interfaces already resolved.

Then there is compliance across the chain. Authority standards, Chain of Responsibility and National Heavy Vehicle regulations govern how equipment is transported and installed, and every step needs documentation that survives an audit.

What we supply to infrastructure and transport

Switchboards and Cable

Tested to standard

Low-voltage switchboards engineered, manufactured and tested to AS/NZS 61439, plus fire rated and industrial cable from the same point of contact.

Standard
AS/NZS 61439

Cable Range
2,000+ products

Elongated Type Substations

Designed for scale, built for accessibility

Elongated footprint enabling segregation and flexible integration across utility, infrastructure, industrial and renewable energy applications.

RATINGS
315–10,000 kVA

Voltage
Up to 36 kV

Packaged Substations

Single lift, ready to connect

Transformer, HV and LV switchgear in one enclosure, tested and accepted before it leaves our factory.

RATINGS
50 kVA – 20 MVA

Install
Single lift

Why contractors and authorities choose Tyree

DELIVERED TO PROGRAM

Dates we can commit to

Manufactured in Australia and New Zealand with capacity exceeding 3,000 substations a year, so your program date is a production decision rather than a shipping estimate.

TESTED IN HOUSE

Accepted before it ships

Testing and acceptance completed in our own ISO 9001, 14001 and 45001 certified laboratories, with full material and process traceability for audit.

SINGLE SOURCE

One supplier, one point of contact

Transformer, substation, switchboard and cable from the same vertically integrated group, so the interfaces between them are our problem rather than yours.

COMPLIANT LOGISTICS

Chain of Responsibility

Trusted logistics partners ensure products arrive safely, on schedule and compliant with Chain of Responsibility and National Heavy Vehicle regulations.

Other Industries

Talk to us about your site.
Send us the load schedule and the site conditions.